Construction Phase Plan – CPP

| | 0 Comments

There are a number of things that you should do while the construction work is being carried out.

What the principal contractor must do in the “construction phase“?

The construction phase plan will include the following information:-

    • Description of project
      • Project description and programme details including any important dates.
    • Details of the project team
    • Extent and location of existing records and plans which are relevant to health and safety on site, including information on existing structures when appropriate.
    • Management of the work
    • Arrangements for: co-operation between the project team on site and co-ordination of their work etc.
    •  Arrangements for controlling significant site risks.
      1. Safety risks
      2. Health risks
    • Significant design and construction hazards.

Tags: CDM 2015>>>F10>>>Pre-Construction Information>>>Pre-Construction Phase>>>Construction Phase>>>Health and Safety File